Adding multiple days of labor to a single crew position/Lasso
Our company is considering integrating Lasso into our workflow and they offer integration with Flex. In Lasso, labor positions are listed out with all of the days in the schedule on a single labor line. Because Flex puts each labor position onto a new line by day, when transferring from Flex to Lasso, each day's labor would appear as a different call, so when staffing the show in Lasso, you would have to assign labor to each of those days individually or manually change one of the lines to include all of the days of labor. Is it possible to add multiple days of labor to a single Labor line in Flex? In other words, could I have multiple Call Time lines listed under a single line of Labor so that one Call Time line is the first day of the event, the next Call Time line is the second day of the event, etc?
Please sign in to leave a comment.
Comments
0 comments